Metraipolis › archive › dc_52bfaf0a3f03

Amy Gillett Bikeway — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/Amy_Gillett_Bikeway
License (as archived)
CC-BY-SA-4.0
Archived
2026-11-08T23:41:18.976Z
SHA-256 of the archived text
375c05db30c5f72bc2752a31666c7f847bb61c73c56e372e0669a8ef2ed477dc
Stable URL of this page
https://metraipolis.com/documento/dc_52bfaf0a3f03

How to cite

Amy Gillett Bikeway — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Amy_Gillett_Bikeway (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_52bfaf0a3f03 (Metraipolis archive dc_52bfaf0a3f03, sha256 375c05db30c5f72bc2752a31666c7f847bb61c73c56e372e0669a8ef2ed477dc)
BibTeX
@misc{dc52bfaf0a3f03,
  title = {Amy Gillett Bikeway — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/Amy_Gillett_Bikeway},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_52bfaf0a3f03; sha256 375c05db30c5f72bc2752a31666c7f847bb61c73c56e372e0669a8ef2ed477dc},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Amy_Gillett_Bikeway. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The Amy Gillett Bikeway or Amy Gillett Rail Trail or Amy Gillett Pathway is a shared path in the Adelaide Hills on part of the alignment of the former Mount Pleasant railway line. It is a 17 kilometres (11 mi) sealed path suitable for recreational cycling, walking and horse riding. The trail is named after Australian track cyclist and rower Amy Gillett. Stage 1 was opened in January 2010 by Patrick Conlon, then the South Australian Minister for Transport, Energy and Infrastructure. Stage 1 extended 4 kilometres (2.5 mi) between Oakbank and Woodside, with kerbside bike lanes on Onkaparinga Valley Road continuing south from the trailhead through Oakbank. Stage 2 extended it through Charleston and Stage 3 opened in May 2014 added 7 kilometres (4.3 mi) to Mount Torrens. Future work could extend it another 15 kilometres (9.3 mi) through Birdwood to Mount Pleasant. Funding for Stage 4 was secured in 2024, with the Adelaide Hills Council agreeing to contribute $500,000. This stage is expected to be completed by mid-2025. The final stage, to linking the bikeway to the existing Barossa Trail, was still under negotiation in April 2024. There are also several side loop trails available to interesting destinations off the main path.

Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico).
Fonte: Wikipedia in inglese, voce «Amy Gillett Bikeway» — https://en.wikipedia.org/wiki/Amy_Gillett_Bikeway
Wikidata Q19460203: «trail in South Australia» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q19460203
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Amy_Gillett_Bikeway?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1373120459, consultata il 2026-11-08T23:37:29.141Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 8a2613777a5e9cc6ee3d2f8a6515addb3044a3df33442dd8096354f27f695bf5