Shift or curtail? How much data-center flexibility is worth depends on the host power grid — arXiv:2608.19622

Source
arXiv (en)
Original
https://arxiv.org/abs/2608.19622
License (as archived)
CC0-1.0
Archived
2026-10-18T12:18:50.719Z
SHA-256 of the archived text
ab452bd490c872e54cce4413a64037dafe2e56e416fad030b19eac0422e55c3f
Stable URL of this page
https://metraipolis.com/documento/dc_520d4003eab3

How to cite

Shift or curtail? How much data-center flexibility is worth depends on the host power grid — arXiv:2608.19622 — arXiv (en), https://arxiv.org/abs/2608.19622 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_520d4003eab3 (Metraipolis archive dc_520d4003eab3, sha256 ab452bd490c872e54cce4413a64037dafe2e56e416fad030b19eac0422e55c3f)
BibTeX
@misc{dc520d4003eab3,
  title = {Shift or curtail? How much data-center flexibility is worth depends on the host power grid — arXiv:2608.19622},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2608.19622},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_520d4003eab3; sha256 ab452bd490c872e54cce4413a64037dafe2e56e416fad030b19eac0422e55c3f},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2608.19622. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, centrally coordinated Korea. In PJM, the flexibility value is spatial: shifting workloads between zones reduces system cost by 6% in 2028 and 19% in 2038, avoiding 4.4 GW and 8.9 GW of gas and nuclear generation. In Korea, it is temporal: shifting load into midday solar hours makes 0.5 GW of additional solar worth building in 2028 and avoids 1.2 GW of gas and 0.3 GW of batteries in 2038. In both, realistic event-shape limits diminish the value of curtailment. The results show that flexibility procurement and its value are driven by grid characteristics and policy objectives.

Tema degli esploratori: governance digitale e beni comuni (retro-catalogo arXiv: annunci del 2026-08-21 in physics.soc-ph).
Categorie arXiv: Physics and Society (physics.soc-ph) ; Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2608.19622 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-18T12:18:06.908Z dalla pagina https://arxiv.org/catchup/physics.soc-ph/2026-08-21?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).