Metraipolis › archive › dc_4e7f34c85967

Data Center Agglomeration and Power Infrastructure Capacity in the United States — arXiv:2611.06737

Source
arXiv (en)
Original
https://arxiv.org/abs/2611.06737
License (as archived)
CC0-1.0
Archived
2026-11-05T18:19:34.143Z
SHA-256 of the archived text
3ea6c0086832050a52b56c21d35cafd1a39efff44373fa13db8f1b5687bcda72
Stable URL of this page
https://metraipolis.com/documento/dc_4e7f34c85967

How to cite

Data Center Agglomeration and Power Infrastructure Capacity in the United States — arXiv:2611.06737 — arXiv (en), https://arxiv.org/abs/2611.06737 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_4e7f34c85967 (Metraipolis archive dc_4e7f34c85967, sha256 3ea6c0086832050a52b56c21d35cafd1a39efff44373fa13db8f1b5687bcda72)
BibTeX
@misc{dc4e7f34c85967,
  title = {Data Center Agglomeration and Power Infrastructure Capacity in the United States — arXiv:2611.06737},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2611.06737},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_4e7f34c85967; sha256 3ea6c0086832050a52b56c21d35cafd1a39efff44373fa13db8f1b5687bcda72},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.06737. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The continuous expansion of digital infrastructure, especially data centers, has imposed unprecedented, geographically concentrated stress on existing power grids. However, rigorous causal evidence quantifying how these facilities reshape local power-infrastructure supply remains limited. This study builds a comprehensive county-level US panel dataset spanning 2010-2024, uniquely integrating individual data center building footprints and power-plant additions. To mitigate endogeneity and high-dimensional confounding, this study deploys Double Machine Learning with five-fold cross-fitting, conditioning on county and year fixed effects alongside regional socioeconomic covariates. Baseline estimation identifies a significant positive causal effect robust across multiple rigorous specifications. The result holds following 1%-99% winsorization that downweights mega-clusters including Loudoun County: growth in data-center floor area drives meaningful increases in nearby power-generation capacity (ATE=1.982, P=0.000, CI: [1.25, 2.72]). Outcomes remain statistically significant using a one-year lagged treatment to address reverse causality, and are stable under state-level fixed-effect alternatives. An event-study framework augmented with historical agglomeration controls validates clear parallel trends and detects a sharp causal spike at t = 3, matching typical utility-scale grid-construction lead times. A placebo test further verifies these causal estimates cannot emerge from random chance. Substantial regional heterogeneity emerges: strong positive impacts concentrate in the West, while significant negative displacement-related effects appear within resource-constrained Northeastern counties. These results deliver timely insights for urban planners and energy regulators, stressing the importance of forward-looking grid-capacity investment to support ongoing digital transformation.

Tema degli esploratori: calcolo e infrastrutture (elenco arXiv cs.AR, nuovi lavori del giorno).
Categorie arXiv: Hardware Architecture (cs.AR).
Pagina del lavoro: https://arxiv.org/abs/2611.06737 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-05T18:13:33.975Z dalla pagina https://arxiv.org/list/cs.AR/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).