Metraipolis › archive › dc_4d8869f6ee7a
Multi-Period Bilevel Coordination of Primary and Secondary Frequency Regulation for Grid-Forming Battery Energy Storage — arXiv:2611.06146
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2611.06146
- License (as archived)
- CC0-1.0
- Archived
- 2026-11-05T18:39:49.975Z
- SHA-256 of the archived text
1f2e09a64796748734825241018498a730f0a0e3396ecfae2de039858d4f90ab- Stable URL of this page
https://metraipolis.com/documento/dc_4d8869f6ee7a
How to cite
Multi-Period Bilevel Coordination of Primary and Secondary Frequency Regulation for Grid-Forming Battery Energy Storage — arXiv:2611.06146 — arXiv (en), https://arxiv.org/abs/2611.06146 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_4d8869f6ee7a (Metraipolis archive dc_4d8869f6ee7a, sha256 1f2e09a64796748734825241018498a730f0a0e3396ecfae2de039858d4f90ab)
BibTeX
@misc{dc4d8869f6ee7a,
title = {Multi-Period Bilevel Coordination of Primary and Secondary Frequency Regulation for Grid-Forming Battery Energy Storage — arXiv:2611.06146},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2611.06146},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_4d8869f6ee7a; sha256 1f2e09a64796748734825241018498a730f0a0e3396ecfae2de039858d4f90ab},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.06146. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
We study the coordination of primary and secondary frequency regulation by grid-forming battery energy storage systems in islanded microgrids. We formulate the coordination as a multi-period bilevel program, in which the upper level schedules secondary regulation setpoints and each lower level computes primary regulation decisions. Using the lower-level Karush-Kuhn-Tucker conditions, we obtain an exact single-level reformulation with complementarity constraints. To address the numerical difficulties introduced by these constraints, we develop a continuation method that couples the complementarity relaxation parameter with the interior-point barrier parameter and warm-starts successive stages. Under the stated boundedness assumptions and with vanishing subproblem residuals, we prove that every accumulation point is feasible and satisfies a first-order stationarity condition for the reformulated problem (C-stationarity). Numerical results for an islanded microgrid show that the proposed method reduces solution time by 89.3% and peak frequency deviation by 0.53% relative to conventional Scholtes relaxation. Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno). Categorie arXiv: Systems and Control (eess.SY). Pagina del lavoro: https://arxiv.org/abs/2611.06146 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-11-05T18:31:46.487Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).