Data Center Load Reductions: Attribution, Measurement Limits, and Estimation — arXiv:2610.38216
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2610.38216
- License (as archived)
- CC0-1.0
- Archived
- 2026-11-01T03:00:40.910Z
- SHA-256 of the archived text
77d70b60f26106832595fd968dd2571cbce9aeadd701c6313694f63b10c2723b- Stable URL of this page
https://metraipolis.com/documento/dc_4532c0acf0cf
How to cite
Data Center Load Reductions: Attribution, Measurement Limits, and Estimation — arXiv:2610.38216 — arXiv (en), https://arxiv.org/abs/2610.38216 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_4532c0acf0cf (Metraipolis archive dc_4532c0acf0cf, sha256 77d70b60f26106832595fd968dd2571cbce9aeadd701c6313694f63b10c2723b)
BibTeX
@misc{dc4532c0acf0cf,
title = {Data Center Load Reductions: Attribution, Measurement Limits, and Estimation — arXiv:2610.38216},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2610.38216},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_4532c0acf0cf; sha256 77d70b60f26106832595fd968dd2571cbce9aeadd701c6313694f63b10c2723b},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.38216. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Hundreds of gigawatts of data center loads are seeking interconnection in the United States given the massive growth of artificial intelligence and cloud computing. In recent years, several incidents of data centers reducing their loads by hundreds to thousands of megawatts have been documented, raising grid reliability concerns. U.S. regulators have since ordered reliability standards for the integration of computational loads, and the North American Electric Reliability Corporation (NERC) now calls on transmission owners to install disturbance recorders at these facilities to support root cause analysis. Such recorders usually observe only electrical quantities at the point of interconnection (POI). A sudden load reduction can be caused by a change in workload or a switch to backup supply. This work shows when POI measurements can distinguish the two mechanisms. It is established that they can produce identical POI voltage and current in a quasi-static constant power model, and during the transient their separation depends on the reduction relative to measurement noise, the clearing time, the dynamics through which workload reaches the POI, and the recorder bandwidth. When POI data are insufficient, an estimator that uses workload data is proposed to determine how much of the facility stayed connected. The results of this work identify the measurements and grid information utilities need to determine why data center load dropped. Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno). Categorie arXiv: Systems and Control (eess.SY). Pagina del lavoro: https://arxiv.org/abs/2610.38216 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-11-01T02:25:30.728Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).