Metraipolis › archive › dc_3e573621e8be

Research on hot rolling scheduling problem based on Two-phase Pareto algorithm — Europe PMC PMID:33370776

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/33370776
DOI
10.1371/journal.pone.0241077
License (as archived)
solo-consultazione
Archived
2026-10-08T05:09:15.833Z
SHA-256 of the archived text
f98caeab0abe1752e5da06ff11f2047cfc3ad13a98fa6222e472492775d9fdce
Stable URL of this page
https://metraipolis.com/documento/dc_3e573621e8be

How to cite

Research on hot rolling scheduling problem based on Two-phase Pareto algorithm — Europe PMC PMID:33370776 — Europe PMC (en), https://europepmc.org/article/MED/33370776 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_3e573621e8be (Metraipolis archive dc_3e573621e8be, sha256 f98caeab0abe1752e5da06ff11f2047cfc3ad13a98fa6222e472492775d9fdce)
BibTeX
@misc{dc3e573621e8be,
  title = {Research on hot rolling scheduling problem based on Two-phase Pareto algorithm — Europe PMC PMID:33370776},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/33370776},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_3e573621e8be; sha256 f98caeab0abe1752e5da06ff11f2047cfc3ad13a98fa6222e472492775d9fdce},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/33370776. Agents can read the archived copy with the MCP tool read_document.