Metraipolis › archive › dc_358fc245f541

Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems — arXiv:2608.15076

Source
arXiv (en)
Original
https://arxiv.org/abs/2608.15076
License (as archived)
CC0-1.0
Archived
2026-10-19T02:13:21.194Z
SHA-256 of the archived text
8723f872b16c6f2680980731a8151056316540889e63522f4f470b7324d24e96
Stable URL of this page
https://metraipolis.com/documento/dc_358fc245f541

How to cite

Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems — arXiv:2608.15076 — arXiv (en), https://arxiv.org/abs/2608.15076 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_358fc245f541 (Metraipolis archive dc_358fc245f541, sha256 8723f872b16c6f2680980731a8151056316540889e63522f4f470b7324d24e96)
BibTeX
@misc{dc358fc245f541,
  title = {Industrial Load Modeling and Optimization for Market-Based Interaction with Power Systems — arXiv:2608.15076},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2608.15076},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_358fc245f541; sha256 8723f872b16c6f2680980731a8151056316540889e63522f4f470b7324d24e96},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2608.15076. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Industrial loads account for over 60% of China's electricity consumption and can provide substantial flexibility for renewable-dominated power systems. Their market participation remains limited by complex production constraints, unavailable equipment parameters, and the computational scale of resource coordination. This dissertation addresses these barriers from the perspective of a load aggregator. It reformulates the State Task Network and Resource Task Network as the Linearized State Task Network and continuous Resource Task Network. In a standard grid-interaction case, the reformulation reduces solution time from 24 hours to 30 minutes and supports coordinated optimization of 2,000 industrial users. Production Scheduling Identification combines process knowledge and cost-minimizing behavior with hourly smart-meter data; using 21 training days, it achieves load-model errors of 5.2% and 8.5% for cement and steel-powder cases, compared with 13.4%-19.2% for machine-learning baselines. Data-Driven Dimension Reduction yields errors of 3.6%-10.3% across three industrial cases and replaces 10,208 integer variables with 24-48 continuous variables in the steelmaking case. For market interaction, a joint bidding and power-disaggregation framework uses shadow prices to allocate real-time commands among tens of thousands of resources through millisecond-level arithmetic. In a representative comparison, it reduces interaction costs by 40% while retaining the solution quality of the joint optimization model. These contributions keep detailed industrial process models available for executable scheduling while providing aggregators with compact models for flexibility assessment, portfolio optimization, and electricity-market participation.

Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-08-18 in eess.SY).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2608.15076 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-19T01:24:59.537Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-08-18?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).