Metraipolis › archive › dc_33cfe5883983

ScheduleGen: Demonstration Generation via Skill Scheduling for Multi-Arm Imitation Learning — arXiv:2610.39429

Source
arXiv (en)
Original
https://arxiv.org/abs/2610.39429
License (as archived)
CC0-1.0
Archived
2026-11-01T02:44:26.006Z
SHA-256 of the archived text
cf63bba59cbdf2cd9e60f83554839e9d84b73624f8fbd9fc76d345d4891cc89b
Stable URL of this page
https://metraipolis.com/documento/dc_33cfe5883983

How to cite

ScheduleGen: Demonstration Generation via Skill Scheduling for Multi-Arm Imitation Learning — arXiv:2610.39429 — arXiv (en), https://arxiv.org/abs/2610.39429 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_33cfe5883983 (Metraipolis archive dc_33cfe5883983, sha256 cf63bba59cbdf2cd9e60f83554839e9d84b73624f8fbd9fc76d345d4891cc89b)
BibTeX
@misc{dc33cfe5883983,
  title = {ScheduleGen: Demonstration Generation via Skill Scheduling for Multi-Arm Imitation Learning — arXiv:2610.39429},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2610.39429},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_33cfe5883983; sha256 cf63bba59cbdf2cd9e60f83554839e9d84b73624f8fbd9fc76d345d4891cc89b},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.39429. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Multi-arm robot platforms, including bimanual and humanoid robots, have the capability to complete tasks with lower cycle times than single-arm systems, but they are more difficult to safely control due to the presence of multi-arm constraints. The paradigm of training generalist robot policies from massive datasets is a promising approach to address general-purpose multi-arm manipulation, but the acquisition of large multi-arm manipulation datasets remains a bottleneck. Automated demonstration generation can alleviate this burden by synthesizing new demonstrations from a handful of source demonstrations, but existing algorithms ignore multi-arm constraints and as a result often induce unsafe and unsuccessful behaviors. We address this limitation by introducing ScheduleGen, an integrated planning & scheduling algorithm for multi-arm demonstration generation. We evaluate ScheduleGen on 28 simulation task variants, including seven externally authored RoboDojo tasks and settings inaccessible to prior systems; it achieves 79.6% mean data-generation success and trains policies with 65.5% mean success. ScheduleGen policies outperform those trained on a state-of-the-art data generation baseline, and achieve 50-80% success across eight real-world variants through zero-shot sim-to-real and real-to-sim-to-real transfer. Videos and more at: this https URL

Tema degli esploratori: statistica e scienza dei dati (elenco arXiv cs.RO, nuovi lavori del giorno).
Categorie arXiv: Robotics (cs.RO).
Pagina del lavoro: https://arxiv.org/abs/2610.39429 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-01T02:16:58.659Z dalla pagina https://arxiv.org/list/cs.RO/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).