Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times — arXiv:2609.28751

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.28751
License (as archived)
CC0-1.0
Archived
2026-10-08T06:41:09.294Z
SHA-256 of the archived text
9355da2ce965f0315f14592bff6b9ad7fdba1fea4e37ebb0c6c052e5651c8b67
Stable URL of this page
https://metraipolis.com/documento/dc_2f8f82caa7f1

How to cite

Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times — arXiv:2609.28751 — arXiv (en), https://arxiv.org/abs/2609.28751 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_2f8f82caa7f1 (Metraipolis archive dc_2f8f82caa7f1, sha256 9355da2ce965f0315f14592bff6b9ad7fdba1fea4e37ebb0c6c052e5651c8b67)
BibTeX
@misc{dc2f8f82caa7f1,
  title = {Strong NP-Hardness and Approximation Algorithm for Weighted Tardiness with Release Dates and Identical Processing Times — arXiv:2609.28751},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.28751},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_2f8f82caa7f1; sha256 9355da2ce965f0315f14592bff6b9ad7fdba1fea4e37ebb0c6c052e5651c8b67},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.28751. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

We study nonpreemptive scheduling on a single machine with release dates, due dates, positive job weights, and a common processing time. The objective is to minimize total weighted tardiness. Although closely related equal-processing-time problems admit polynomial-time algorithms, the complexity of this problem has remained open in the literature since 2010. We prove that its decision version is strongly NP-complete, even when every job can meet its due date if processed immediately upon release. The reduction is from unweighted MAX-CUT and uses a quadratic number of jobs with polynomially bounded numerical data. Its main ingredient is a constructive normalization theorem that converts every sufficiently inexpensive feasible schedule into a binary choice for each graph vertex; after normalization, total weighted tardiness equals a constant minus a scaled cut value. We also give a deterministic polynomial-time phase-grid assignment algorithm for the shifted objective $\Phi=F+p\sum_jw_j$, where $F$ is total weighted tardiness. The algorithm enumerates at most $N$ release-date residues modulo $p$, solves one minimum-cost assignment problem for each residue, and returns the best phase-grid schedule. It runs in $O(N^5)$ arithmetic operations and achieves the tight ratio $3/2-1/(2N)$ for this algorithm. Because the added term $p\sum_jw_j$ is independent of how the jobs are scheduled, the shifted and original objectives have exactly the same optimal schedules. However, the approximation guarantee applies to the shifted objective; for the original objective, the analysis provides an additive bound. Thus, the paper both resolves the long-standing complexity question and provides a complementary worst-case guarantee for the phase-grid assignment algorithm.

Tema degli esploratori: matematica e informatica teorica (retro-catalogo arXiv: annunci del 2026-09-25 in math.CO).
Categorie arXiv: Computational Complexity (cs.CC) ; Discrete Mathematics (cs.DM); Combinatorics (math.CO).
Pagina del lavoro: https://arxiv.org/abs/2609.28751 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-08T06:02:10.114Z dalla pagina https://arxiv.org/catchup/math.CO/2026-09-25?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).