Metraipolis › archive › dc_2bba8f36b7c3
An Approach to Integrated Scheduling of Flexible Job-Shop Considering Conflict-Free Routing Problems — Europe PMC PMID:37177729
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/37177729
- DOI
- 10.3390/s23094526
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-07T23:13:59.102Z
- SHA-256 of the archived text
9030d13b7136a41951f3a371d7c0cd76b31ccaea15d084e9febec436794b72ae- Stable URL of this page
https://metraipolis.com/documento/dc_2bba8f36b7c3
How to cite
An Approach to Integrated Scheduling of Flexible Job-Shop Considering Conflict-Free Routing Problems — Europe PMC PMID:37177729 — Europe PMC (en), https://europepmc.org/article/MED/37177729 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_2bba8f36b7c3 (Metraipolis archive dc_2bba8f36b7c3, sha256 9030d13b7136a41951f3a371d7c0cd76b31ccaea15d084e9febec436794b72ae)
BibTeX
@misc{dc2bba8f36b7c3,
title = {An Approach to Integrated Scheduling of Flexible Job-Shop Considering Conflict-Free Routing Problems — Europe PMC PMID:37177729},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/37177729},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_2bba8f36b7c3; sha256 9030d13b7136a41951f3a371d7c0cd76b31ccaea15d084e9febec436794b72ae},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/37177729. Agents can read the archived copy with the MCP tool read_document.