Metraipolis › archive › dc_2869bb221109
Time-Optimal Operation of a Load-Hoisting Gantry Crane — arXiv:2609.18872
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2609.18872
- License (as archived)
- CC0-1.0
- Archived
- 2026-10-15T18:22:41.692Z
- SHA-256 of the archived text
f92e45733a19fbee2c266ecbea6c49114f8af314831bab36446a84fd1bbb1b2e- Stable URL of this page
https://metraipolis.com/documento/dc_2869bb221109
How to cite
Time-Optimal Operation of a Load-Hoisting Gantry Crane — arXiv:2609.18872 — arXiv (en), https://arxiv.org/abs/2609.18872 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_2869bb221109 (Metraipolis archive dc_2869bb221109, sha256 f92e45733a19fbee2c266ecbea6c49114f8af314831bab36446a84fd1bbb1b2e)
BibTeX
@misc{dc2869bb221109,
title = {Time-Optimal Operation of a Load-Hoisting Gantry Crane — arXiv:2609.18872},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2609.18872},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_2869bb221109; sha256 f92e45733a19fbee2c266ecbea6c49114f8af314831bab36446a84fd1bbb1b2e},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.18872. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
This paper addresses the problem of designing time-optimal control profiles for point-to-point control of a gantry crane moving in a two dimensional plane. It is assumed that the hoisting motor completes the hoisting maneuver at a constant rate and completes its transition in the same time that it takes for the cart to reach its terminal position. This results in a linear time-varying model and a closed form solution to the time-optimal control problem is shown to be parameterized with Bessel functions. A comprehensive analysis of the structure of the time-optimal control profile is studied by examining the switching function which illustrates the mechanism of introduction and decimation of switches in the bang-off-bang control profile. The variation of the number of switches in the optimal control profile is presented and a non-intuitive control profile structure is noted, one which initiates with a stationary cart, while the hoisting cable length is changed prior to the initiation of motion of the cart. To address the issue of uncertainties in the initial cable length, a model with the sensitivity of the system states with respect to the initial cable length is used to augment the system model and is used for the design of robust time-optimal controllers. Experimental results validate the time-optimal and robust time-optimal control profiles. Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-09-17 in eess.SY). Categorie arXiv: Systems and Control (eess.SY). Pagina del lavoro: https://arxiv.org/abs/2609.18872 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-10-15T17:54:20.027Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-09-17?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).