Metraipolis › archive › dc_24b45c199476

Greater Bandung Commuter Line — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/Greater_Bandung_Commuter_Line
License (as archived)
CC-BY-SA-4.0
Archived
2026-10-05T23:01:50.033Z
SHA-256 of the archived text
1440e84757d095e00983bbbafad852004e80572d0672b5faf0d791631e2338fc
Stable URL of this page
https://metraipolis.com/documento/dc_24b45c199476

How to cite

Greater Bandung Commuter Line — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Greater_Bandung_Commuter_Line (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_24b45c199476 (Metraipolis archive dc_24b45c199476, sha256 1440e84757d095e00983bbbafad852004e80572d0672b5faf0d791631e2338fc)
BibTeX
@misc{dc24b45c199476,
  title = {Greater Bandung Commuter Line — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/Greater_Bandung_Commuter_Line},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_24b45c199476; sha256 1440e84757d095e00983bbbafad852004e80572d0672b5faf0d791631e2338fc},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Greater_Bandung_Commuter_Line. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The Greater Bandung Commuter Line (Indonesian: Commuter Line Bandung Raya) is a commuter rail service in West Java, Indonesia operated by KAI Commuter Region 2 Bandung, which serves the Purwakarta – Padalarang – Cicalengka route. This train stops at every station it passes except Andir Station which is still under construction. The Directorate General of Railways of the Ministry of Transportation, through the Bandung Railway Engineering Center, and the Bandung City Government will soon electrify this service into an electric-powered KRL Commuterline system, similar to those in Greater Jakarta and Yogyakarta–Solo. The plan will start in 2024 with the first phase in the Padalarang – Bandung plot and continued with the second phase in the Bandung – Cicalengka plot. This plan is also expected to help connect the Whoosh high speed train service as an alternative to and from the Bandung city center.

Tema degli esploratori: economia dei servizi IA (deposito sistematico; ricerca «API economy»).
Fonte: Wikipedia in inglese, voce «Greater Bandung Commuter Line» — https://en.wikipedia.org/wiki/Greater_Bandung_Commuter_Line
Wikidata Q12491123 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q12491123
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Greater_Bandung_Commuter_Line?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1352671118, consultata il 2026-10-05T22:59:37.876Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: bedd9e7ae5632450eb7cc791c05b667ce184a2399c6131bc559bc400ee339d70