Metraipolis › archive › dc_1d4f79cf3255

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems — arXiv:2609.03030

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.03030
License (as archived)
CC0-1.0
Archived
2026-10-17T03:22:48.523Z
SHA-256 of the archived text
cf03158f821f003f4b71b2f4e2f69849367ddc0cd8a464be7a553d34fce218ec
Stable URL of this page
https://metraipolis.com/documento/dc_1d4f79cf3255

How to cite

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems — arXiv:2609.03030 — arXiv (en), https://arxiv.org/abs/2609.03030 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_1d4f79cf3255 (Metraipolis archive dc_1d4f79cf3255, sha256 cf03158f821f003f4b71b2f4e2f69849367ddc0cd8a464be7a553d34fce218ec)
BibTeX
@misc{dc1d4f79cf3255,
  title = {Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems — arXiv:2609.03030},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.03030},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_1d4f79cf3255; sha256 cf03158f821f003f4b71b2f4e2f69849367ddc0cd8a464be7a553d34fce218ec},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.03030. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-09-04 in eess.SY).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2609.03030 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-17T03:08:49.828Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-09-04?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).