Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage Control — arXiv:2611.08777
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2611.08777
- License (as archived)
- CC0-1.0
- Archived
- 2026-11-09T23:03:33.267Z
- SHA-256 of the archived text
aec627944aaebff91ec186f5fef70ad9bce1bdee4be0cb04a01a0002f465160c- Stable URL of this page
https://metraipolis.com/documento/dc_1d4e0cb965a8
How to cite
Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage Control — arXiv:2611.08777 — arXiv (en), https://arxiv.org/abs/2611.08777 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_1d4e0cb965a8 (Metraipolis archive dc_1d4e0cb965a8, sha256 aec627944aaebff91ec186f5fef70ad9bce1bdee4be0cb04a01a0002f465160c)
BibTeX
@misc{dc1d4e0cb965a8,
title = {Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage Control — arXiv:2611.08777},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2611.08777},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_1d4e0cb965a8; sha256 aec627944aaebff91ec186f5fef70ad9bce1bdee4be0cb04a01a0002f465160c},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.08777. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Fault-induced transfers of large data centers to backup supply can cause abrupt reductions in grid-served demand. Coordinating reactive-power support to mitigate these transfers requires consideration of facility-specific voltage--duration ride-through characteristics, particularly when support capacity is limited. This paper develops a ride-through-aware extension of quadratic voltage control that assesses voltage deviations relative to the admissible margins specified by these characteristics. We establish four design requirements that jointly express envelope-based severity, duration dependence, and preventive voltage-restoration incentives. Within a multiplicatively gated quadratic class, we derive necessary and sufficient conditions for satisfying these requirements and construct an explicit family of envelope-normalized objectives. We apply the proposed objectives to reactive-power coordination and evaluate their performance on the IEEE 14-bus, New England 39-bus, and NPCC 140-bus systems. Comparisons with Volt/VAR control, conventional nominal-voltage tracking, and recent data-center voltage-control methods demonstrate improved data-center retention under matched reactive-power support constraints. In the IEEE 14-bus study, the proposed controller reduces the mean data-center disconnection rate by 44.8\% and grid-demand loss by 27.4\% compared with the best-performing baseline. These results highlight the benefit of incorporating data-center ride-through requirements into reactive-power allocation. Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno). Categorie arXiv: Systems and Control (eess.SY). Pagina del lavoro: https://arxiv.org/abs/2611.08777 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-11-09T22:58:52.097Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).