Metraipolis › archive › dc_1d15841a86ec

2023 Panamanian protests — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/2023_Panamanian_protests
License (as archived)
CC-BY-SA-4.0
Archived
2026-11-05T19:27:44.751Z
SHA-256 of the archived text
630d717e92d1dee975e82e1461a120d1e1b31688c1d2b2c0cd3d681ca2d05553
Stable URL of this page
https://metraipolis.com/documento/dc_1d15841a86ec

How to cite

2023 Panamanian protests — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/2023_Panamanian_protests (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_1d15841a86ec (Metraipolis archive dc_1d15841a86ec, sha256 630d717e92d1dee975e82e1461a120d1e1b31688c1d2b2c0cd3d681ca2d05553)
BibTeX
@misc{dc1d15841a86ec,
  title = {2023 Panamanian protests — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/2023_Panamanian_protests},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_1d15841a86ec; sha256 630d717e92d1dee975e82e1461a120d1e1b31688c1d2b2c0cd3d681ca2d05553},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/2023_Panamanian_protests. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

A series of protests began in Panama on 20 October 2023 following the immediate passing of a 20-to-40-year mining contract between the government of Panama and First Quantum Minerals, the operator of Cobre Panamá, the largest open-pit copper mine in Central America, placed 20 minutes away from the western coast of Colon Province and within a protected area of the Mesoamerican Biological Corridor. Demonstrations started in Panama City shortly after Laurentino Cortizo, the president of Panama, signed into law the mining contract approved by the National Assembly in a 43–5 vote, in less than 12 hours. The protests and road closures expanded nationwide as soon as the public learned of the undisclosed details of the negotiation and approval process of the mining contract. Demonstration hotspots included Panama City, Colón, La Chorrera, Penonomé, Santiago and David, with massive demonstrations for many days, and multiple road closures throughout the Pan-American Highway and minor roads. President Laurentino Cortizo and his administration appeared multiple times on national media discussing protests and the economic impact of the road closures, justifying their support of the mining contract, without significant progress being made in reducing demonstrations. Eventually, the president proposed a national referendum on whether to preserve the mining contract, which was initially approved by the National Assembly even though it faced strong opposition of the public and the Electoral Tribunal (the electoral commission of the country), but was later dismissed due to numerous concerns. An initiative of repelling the mining contract with a new law was also initially approved by the National Assembly, but it was dismissed by consensus as well, as numerous lawyers suggested that the unconstitutionality would be the most appropriate way to shut down Cobre Panamá and ensuring better defense in an eventual international arbitration process. First Quantum reported that its subsidiary MPSA made a tax and royalty payment on November 16, 2023 of $567 million for the period from December 2021 to October 2023. Following weeks of protests, the president signed Executive Decree (executive order) 23 as a mining moratorium in the country, and later the National Assembly approved a bill suspending the approval of new mining concessions in Panamanian territory on 3 November 2023, which was immediately signed into law by President Laurentino Cortizo as Law 407. Meanwhile, First Quantum Minerals was forced to reduce their operations in Cobre Panamá due to the road and sea blockades near the mine and the Punta Rincón port, their export area, by fishermen of the Donoso District. This caused the mine to not receive coal for its power plant which caused the mine to reduce operations on November 14 and later stop operations on November 23. First Quantum's stock fell by 50%. On 28 November 2023, the Supreme Court of Justice unanimously ruled the mining contract as unconstitutional, i

Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico).
Fonte: Wikipedia in inglese, voce «2023 Panamanian protests» — https://en.wikipedia.org/wiki/2023_Panamanian_protests
Wikidata Q123415710: «2023 protests in Panama against a 20-to-40-years mining contract» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q123415710
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/2023_Panamanian_protests?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1383411910, consultata il 2026-11-05T19:11:12.750Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 61b758db5fa96a6d7382934c06b3241af0b1c3c96dda9dde072403352083c056