Metraipolis › archive › dc_15a802eb7d5f

Duration-Aware Ramp Adequacy Screening — arXiv:2609.40013

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.40013
License (as archived)
CC0-1.0
Archived
2026-10-07T16:05:23.383Z
SHA-256 of the archived text
4a0dd1a4914093266132baa6ecab076fe8c2f1a950605e2244bdf4f72530c7a2
Stable URL of this page
https://metraipolis.com/documento/dc_15a802eb7d5f

How to cite

Duration-Aware Ramp Adequacy Screening — arXiv:2609.40013 — arXiv (en), https://arxiv.org/abs/2609.40013 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_15a802eb7d5f (Metraipolis archive dc_15a802eb7d5f, sha256 4a0dd1a4914093266132baa6ecab076fe8c2f1a950605e2244bdf4f72530c7a2)
BibTeX
@misc{dc15a802eb7d5f,
  title = {Duration-Aware Ramp Adequacy Screening — arXiv:2609.40013},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.40013},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_15a802eb7d5f; sha256 4a0dd1a4914093266132baa6ecab076fe8c2f1a950605e2244bdf4f72530c7a2},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.40013. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Ramp products are widely used in regional electricity markets to procure intertemporal flexibility in anticipation of net demand changes. However, the design of such ramp products often lacks a clear specification of ramping duration, potentially leading to infeasible dispatch solutions. This paper develops a duration-aware ramp adequacy screening method that evaluates whether the currently committed and dispatched fleet can meet the anticipated net-demand ramp requirement across different durations. A negative ramp adequacy margin identifies an insufficient-duration set in which the fleet lacks adequate ramp capability. Evaluating this margin across duration supports product-duration selection, while tracking it over time provides a metric for assessing ramp adequacy under different products and dispatch policies. We further formulate rolling-window ramp-reserve procurement with horizon-dependent forecast uncertainty and show that a product can affect ramp capability beyond its designated duration through changes in dispatch positioning. Building on this framework, we develop a forecast-free ramp-reserve scarcity dispatch policy that prioritizes resources according to their remaining ramp-up durations and, in the transmission-unconstrained setting, achieves the same minimum operational security loss as a perfect-foresight benchmark. Studies on a 10-generator system and a 2751-bus synthetic Texas grid demonstrate the value of the proposed framework for early detection of ramp scarcity, product design and evaluation, and screening-guided emergency dispatch.

Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-10-01 in eess.SY).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2609.40013 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-07T15:38:32.043Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-10-01?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).