Metraipolis › archive › dc_0e36ec3a2f2f

Siting and Curtailment Depth Limit the Grid Headroom Available to New Large Loads — arXiv:2611.00462

Source
arXiv (en)
Original
https://arxiv.org/abs/2611.00462
License (as archived)
CC0-1.0
Archived
2026-11-03T18:29:42.741Z
SHA-256 of the archived text
b3802b1d8e80c10a59d8a3071d1e03645df0b7e5a3199bef5b0ec5a7b60405de
Stable URL of this page
https://metraipolis.com/documento/dc_0e36ec3a2f2f

How to cite

Siting and Curtailment Depth Limit the Grid Headroom Available to New Large Loads — arXiv:2611.00462 — arXiv (en), https://arxiv.org/abs/2611.00462 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_0e36ec3a2f2f (Metraipolis archive dc_0e36ec3a2f2f, sha256 b3802b1d8e80c10a59d8a3071d1e03645df0b7e5a3199bef5b0ec5a7b60405de)
BibTeX
@misc{dc0e36ec3a2f2f,
  title = {Siting and Curtailment Depth Limit the Grid Headroom Available to New Large Loads — arXiv:2611.00462},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2611.00462},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_0e36ec3a2f2f; sha256 b3802b1d8e80c10a59d8a3071d1e03645df0b7e5a3199bef5b0ec5a7b60405de},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.00462. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Data center demand is increasing faster than generation can be built, encouraging proposals to interconnect large loads on condition that they reduce consumption during high-stress periods. Estimates of how much load can be added via flexibility rest on simplified accounting and report only annual curtailed electricity. Here we use a national energy systems model that co-optimizes hourly generation and load curtailment across 16 U.S. regions to characterize the flexibility and power system impacts of enabling headroom. While 50 GW can be served while curtailing less than 0.1% of its annual energy, small annual curtailment conceals potentially severe operating requirements. Most regions require curtailment deeper than 90% in at least one hour, so the load must disconnect or have sufficient on-site resources to provide full back up. Furthermore, announced data center locations are not aligned with modeled headroom and relying on existing generation fleets raises CO2 emissions and wholesale electricity prices.

Tema degli esploratori: economia dei servizi IA (elenco arXiv econ.GN, nuovi lavori del giorno).
Categorie arXiv: Physics and Society (physics.soc-ph) ; General Economics (econ.GN).
Pagina del lavoro: https://arxiv.org/abs/2611.00462 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-03T18:11:37.687Z dalla pagina https://arxiv.org/list/econ.GN/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).