Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation — arXiv:2611.09001

Source
arXiv (en)
Original
https://arxiv.org/abs/2611.09001
License (as archived)
CC0-1.0
Archived
2026-11-09T22:42:38.799Z
SHA-256 of the archived text
8f3ec255f2cef7c4ded6b69a7ce2a727c310bc1d64eb42e0c6e9b77b4228e7b1
Stable URL of this page
https://metraipolis.com/documento/dc_0e16dc23aec4

How to cite

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation — arXiv:2611.09001 — arXiv (en), https://arxiv.org/abs/2611.09001 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_0e16dc23aec4 (Metraipolis archive dc_0e16dc23aec4, sha256 8f3ec255f2cef7c4ded6b69a7ce2a727c310bc1d64eb42e0c6e9b77b4228e7b1)
BibTeX
@misc{dc0e16dc23aec4,
  title = {Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation — arXiv:2611.09001},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2611.09001},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_0e16dc23aec4; sha256 8f3ec255f2cef7c4ded6b69a7ce2a727c310bc1d64eb42e0c6e9b77b4228e7b1},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.09001. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

Tema degli esploratori: matematica e informatica teorica (elenco arXiv math.OC, nuovi lavori del giorno).
Categorie arXiv: Systems and Control (eess.SY) ; Optimization and Control (math.OC).
Pagina del lavoro: https://arxiv.org/abs/2611.09001 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-09T22:35:32.280Z dalla pagina https://arxiv.org/list/math.OC/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).