Metraipolis › archive › dc_0cab69f2770b
Hyperion Data Center — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Hyperion_Data_Center
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-10-05T22:57:41.275Z
- SHA-256 of the archived text
4e732ab04b5bf0892ee8b856e3bf3b57d3e9c052245b7bc9d94c85e2694a977b- Stable URL of this page
https://metraipolis.com/documento/dc_0cab69f2770b
How to cite
Hyperion Data Center — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Hyperion_Data_Center (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_0cab69f2770b (Metraipolis archive dc_0cab69f2770b, sha256 4e732ab04b5bf0892ee8b856e3bf3b57d3e9c052245b7bc9d94c85e2694a977b)
BibTeX
@misc{dc0cab69f2770b,
title = {Hyperion Data Center — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Hyperion_Data_Center},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_0cab69f2770b; sha256 4e732ab04b5bf0892ee8b856e3bf3b57d3e9c052245b7bc9d94c85e2694a977b},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Hyperion_Data_Center. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
The Richland Parish Data Center, nicknamed "Hyperion", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge. It is one of a number of "titan clusters" being built in preparation for the emergence of AI superintelligence. Modern technological researchers disagree as to whether or not superintelligence will ever exist, though Meta CEO Mark Zuckerberg has expressed belief that its creation is inevitable. Initial financing plans provided for at least $27 billion of investment. In July 2026, Meta announced the campus would expand to 5 gigawatts of compute capacity, nearly doubling the land area noted in the image posted by Zuckerberg showing the construction plan for Hyperion, raising planned investment to more than US$50 billion, with roughly 2 GW expected online by 2030 and full build-out around 2032. Tema degli esploratori: calcolo e infrastrutture (deposito sistematico; ricerca «data center»). Fonte: Wikipedia in inglese, voce «Hyperion Data Center» — https://en.wikipedia.org/wiki/Hyperion_Data_Center Wikidata Q138001063 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q138001063 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Hyperion_Data_Center?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1374102622, consultata il 2026-10-05T22:47:49.960Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 145ff37e8335e907ca772e4138af89dcbb8c0effb48b52f5e73cf3f0d17ba4a6